top of page

EXTERIOR

Exterior work is a bit more demanding than interior work a it has more risk's to it and it's weather dependent so this is seasonal work, generally from March to September. 

20150611_171754.jpg
20180510_161138.jpg
20130706_121340.jpg
20140915_115342.jpg
20130619_184527-PANO.jpg
20140804_161152.jpg
Our Vision  

Preparation

It is important that thorough preparation is carried out on any woodwork, render or metal, prior to application before and paint can be applied. Bare wood, render and metal must have the appropriate primer applied before application of and undercoat and topcoat. Choosing the right paint for each surface is very important because the wrong paint applied to a given surface will result in a poorer finish and breakdown of the paint applied, which could lead to a costly repair or replacement. Cracks and holes in the surface must be filled ensuring no moisture too penetrate the surface. Preparation is a time consuming, but it will lead to a better and longer lasting finish, that will save money in the long term. 

Exterior

  • Eaves, fascias, gutters and down pipes

  • French doors

  • Garage doors and carports

  • ​Gates and railings

  • ​Patios, pagodas, decks

  • ​Storage doors

  • ​Window bars

  • Wooden windows

  • Masonry

bottom of page